Towards More Flexible and Robust Data Delivery for Monitoring and Control of the Electric Power Grid
Bakken, Hausen, Gjermundrod, Bose
With the increase in the monitoring of status data at very high rates in high voltage substations and the ability to time synchronize these data with GPS signals, there is a growing need for transmitting this data for monitoring, operation, protection and control needs. The sets of data that need to be transferred and the speed at which they need to be transferred depend on the application – for example, slow for post-event analysis, near real-time for monitoring and as close to real-time as possible for control or protection.